Your panel
The home's available electrical capacity determines what it can support. Panel size alone does not settle that. K-Jay reviews your panel photos with your quote request.

Home EV charging · Practical guide
Compare Level 1 and Level 2 charging for your routine. Your panel, parking location, cable route and equipment determine what can be installed safely and what information an electrician needs.
Request a call from our EV installation team. Tell us how to reach you. Photos, video and technical details can wait.
Most home installations are $1,400 to $2,600 including GST, excluding the charger. We can also install a charger you already own.
Ready for a firm quote? Complete the online intakeSection 01
Start with how far you drive on a normal day. That helps determine which charging level fits before you choose equipment.
| Type | Voltage | Range added/hour | Best for |
|---|---|---|---|
| Level 1 (standard outlet) | 120V | 8 to 12 km/hr | Occasional drivers / plug-in hybrids |
| Level 2 (home EVSE) | 240V | 40 to 80 km/hr | Daily EV drivers (recommended) |
| DC Fast Charge (commercial) | 480V+ | 200 to 400 km/hr | Road trips / commercial fleets |
Conditions: the range figures above are general ranges for each charging level, not a specification for any charger. Real charging speed depends on your vehicle's onboard charger, the EVSE, the circuit it is on, the state of charge, and the temperature. K-Jay's standard offer is Level 2 work at detached homes; Level 1 is included here for comparison, not as a marketed service.
Section 02
These details help us assess the installation. Send photos of what you can see safely; you do not need technical knowledge to get started.
The home's available electrical capacity determines what it can support. Panel size alone does not settle that. K-Jay reviews your panel photos with your quote request.
An attached garage is the straightforward case. When a vehicle parks on a driveway close to the garage, a charger mounted inside near the overhead door will commonly reach it.
Longer wire runs cost more. We assess your garage layout from the same photos and recommend the most practical routing.
A load controller lets the charger share existing capacity, which can make an install work at a 100-amp home without a service upgrade. Your assessment confirms whether it applies.
Conditions: the standard path is a detached home with an accessible panel and practical routing. We quote older homes, panel upgrades, detached garages and trenching individually. Outdoor or driveway-mounted equipment is assessed case by case.
Section 03
The equipment and electrical work determine installation cost. Send the details below so we can price your project.
Match the connector to your vehicle, check its AC charging limit, and choose a cable that reaches your parking spot. Consider indoor or outdoor use and whether app features matter. Send the make and model or a product link; if you are undecided, we can help before you buy.
A hardwired EV charger connects directly to the installed circuit. A plug-in charger uses a compatible receptacle and suitable circuit. J1772 and NACS describe vehicle-side connectors, not that wall receptacle. The home, equipment and requested current determine which installation fits.
Your quote includes circuit sizing, mounting, weatherproofing and final testing together.
Provide the five views as photos or a clear walkthrough video: panel and directory, main breaker, area around the panel, charger location and cable route. The online intake also requires an estimated cable-route length in feet. Keep panel views limited to safely visible information; never remove a cover or touch electrical equipment for a photo. Tell us if a view is unsafe to obtain or another technical detail is unknown. For a standard detached home, usable views are normally enough to begin the remote quote review; we will tell you if closer assessment is needed.
We quote older homes, panel upgrades, detached garages and trenching individually.
Most K-Jay home EV installations cost $1,400 to $2,600 including GST, excluding the charger. Permits, travel, and required load management are included in the agreed quote. Run length, difficulty, and load management shape the price. You can supply your own charger; K-Jay-supplied equipment is a separate upfront line item.
Section 04
| Step | Action | Who does it |
|---|---|---|
| 1 | Complete the online intake and add photos or a clear walkthrough video; save your draft if you need to finish later | You |
| 2 | Free quote in 2 to 3 business days after complete intake and usable views | K-Jay EV/solar sales expert |
| 3 | Electrical permit filed with your municipality | K-Jay Electric |
| 4 | Install day: wiring, mounting, testing | K-Jay Electric |
| 5 | Permit inspection and sign-off | Your municipality's inspector + K-Jay |
Conditions: for a straightforward detached-home install with an accessible panel and practical routing, our photo-led process is planned as a single visit. Jobs that turn out to need a site visit, a panel upgrade, a detached garage, or trenching are assessed individually and may run longer. This guide does not publish a booking lead time; your quote gives the current expectation.
Section 05
If your garage has not been built yet, choose EV options through your builder.
With the walls still open, the charger circuit goes in alongside the rest of the electrical work, avoiding a later retrofit.
A rough-in puts the wiring in place during construction for a later installation, without committing to the charger now.
New-home EV options are selected through your builder's sales team, not through this intake. They will have the current options and pricing.
Use the photo-led quote process described above. You can request it directly from K-Jay.
Conditions: new-home EV options, their scope, and their pricing are set through the builder path and confirmed by your builder's sales team, not on this page.
Intake guidance updated 5 October 2026 using K-Jay owner confirmation. Earlier business copy review: 8 September 2026. Technical review record: 24 August 2026. Figures in this guide marked * or shown in tables are typical or general values, not a quote, a specification, or a guarantee of charging speed. Charging performance depends on your vehicle, equipment, circuit, and temperature; permit and inspection requirements depend on your municipality. What applies to you is what is written in your quote. Next scheduled review: 24 February 2027.
Ready to request a quote?
Start your intake draft with the details you know. You can save it on this device and finish when the required photos or a usable walkthrough video are ready. We need complete intake and usable views before preparing the quote. There is no charge for the quote.