Start with what is changing
Tell us whether you are adding an EV charger, renovating, replacing equipment, or planning other electrical work. Photos and details of the existing panel and new loads help us define the assessment.

K-Jay Electric · Since 1973
Plan a panel change or electrical service upgrade for your Edmonton-area home. K-Jay assesses the existing installation, new loads, permits, and utility coordination before quoting.
Request a Panel AssessmentPlan your project
Tell us whether you are adding an EV charger, renovating, replacing equipment, or planning other electrical work. Photos and details of the existing panel and new loads help us define the assessment.
Replacing a panel and increasing the home's electrical service are different scopes. We assess the existing equipment and planned use before proposing the work, including utility coordination where needed.
Your quote identifies equipment, installation, required permit work, and the agreed scope. We coordinate service and utility requirements for the planned work and discuss the impact on power availability.
If a charger is driving the project, we can assess load management as part of the EV quote. The assessment determines whether that option fits the home or whether an upgrade is appropriate.
Pricing is quote-based because panel replacement, service changes, cable routes, and utility requirements vary. Send your project details through the service intake.
We assess that as part of your EV quote. K-Jay commonly offers load management where appropriate, and the home's available capacity and intended charging setup determine the recommendation.
Serving Edmonton and communities within about a 90-minute drive outside Edmonton. Travel is included in the agreed quote. Complete project information helps us include the full scope.
Request a Panel AssessmentPlan your project · Edmonton
Updated
Request a panel assessment
A panel replacement and a service upgrade address different parts of your home’s electrical setup. The right scope depends on the existing equipment, planned changes and required coordination.
A panel replacement changes the equipment that distributes electricity within your home. A service upgrade changes the electrical service supplying the home. They can be related, but one does not automatically require the other; an assessment of the whole scope helps establish what is being considered.
Tell K-Jay what prompted the request, such as an equipment concern, renovation or planned addition. Read about panel and service upgrades, then discuss how your existing equipment and proposed loads affect the work.
Spare breaker spaces show room in the panel; they do not establish capacity for another load. A service rating alone does not settle the question either. The assessment considers panel space together with the electrical setup's ability to support the planned use.
The assessment should consider what is already in the home alongside what you expect to add. Tell the electrician if you are planning a renovation, installing a charger or adding other equipment, even if the work is still at an early stage. A future addition can change the context of a decision made today.
For an EV charger, the assessment should consider the home’s existing loads, the vehicle and the charging plan. Compatible EV load management may be an option in some cases. It does not establish suitability for your home by itself. Ask what is being assessed and which equipment or utility details remain to be confirmed.
Permits and utility coordination are separate questions from choosing between panel and service work. The City of Edmonton lists service upgrades and new electrical installations among work requiring permits. You can review the City of Edmonton electrical permit information, then confirm the requirements for your specific project with the electrical contractor and the authority.
Before work is planned, ask what permit requirements apply and whether utility coordination is part of the proposed scope. The details depend on the work, so avoid assuming that every panel replacement follows the same process. For K-Jay panel upgrades, assessment of existing equipment, proposed loads, permits and utility coordination takes place before quoting.
Ask how the work could affect power availability at your home and what needs coordination before a scheduled visit. The length and timing of any interruption depend on the project. Get those details for your installation before making plans around a general estimate.
Share the service address, the work you are considering and any relevant changes to the home. If you do not know a technical detail, say so; it can be confirmed later in the service request process.
Include these details with your request:
No. Panel replacement changes the panel equipment, while a service upgrade changes the electrical service supplying the home. The required scope depends on an assessment.
Not necessarily. Spare spaces show room in the panel, but do not establish whether the overall electrical setup can support a planned addition.
Permit requirements depend on the work. The City lists service upgrades and new electrical installations among work requiring permits; confirm the requirements for your project.